2022-10-21
|
1
UNT
|
11000KG
|
PROJECT SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP 02 INMG LIFTING BEAM NET WEIGHT KG ... 11000 GROSS WEIGHT KG ... 11000 DIMENSIONS MM ... FREIGHT PREPAID
|
HS 310510
|
2022-09-04
|
4
UNT
|
94100KG
|
10920X2800X1720 BOTTOM ELEMENT INMG GATE # 2 10920X1720X3425 MIDDLE ELEMENT INMG GATE # 2 NR. 2 LUGS TYPE F NR. 16 SCREWS M24X100 CL. 8.8 A2 70 DIN 267 MK. 19 NR. 16 HEX NU TS M24 CL. 8 A2 70 DIN 267 MK. 20 NR. 32 WA SHERS M2 A2 HV200 MK. 21 10920X2720X1720 MIDDLE ELEMENT INMG GATE #2 10920X1720X3425 MIDDLE ELEMENT INMG GATE # 2 NR. 2 LUGS TYPE F NR. 16 SCREWS M24X100 CL. 8.8 A2 70 DIN 267 MK. 19 NR. 16 HEX NU TS M24 CL. 8 A2 70 DIN 267 MK. 20 NR. 32 WA SHERS M2 A2 HV200 MK. 21 10920X2720X1720 MIDDLE ELEMENT INMG GATE #2 10920X3585X1720 TOP ELEMENT INMG GATE #2 NR. 1 PLATE THK 10 MK. 01 ASTM A276 TP. 410 T NR. 1 PIN O220 ASTM A276 TP. 410 T MK. 02 NR. 2 HEX BOLTS UNI 5739 M16X60 A2 70 DIN 267 MK. 04 PROJECT SITE C CLEAN ENERGY PRO JECT ATB JOB 30104 CP02 INMG GATE #1 ELEME NTS NET WEIGHT KG ... 94100 GROSS WEIGHT KG ... 94100 DIMENSIONS MM ... FREIGHT PREPAID
|
HS 180632
|
2022-07-23
|
4
UNT
|
94100KG
|
LOWER ELEMENT MIDDLE ELEMENT. UPPER ELEMENT PROJECT SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP02 INMG GATE #1 EL EMENTS NET WEIGHT KG ... 94100 GROSS WEIG HT KG ... 94100 DIMENSIONS MM ... FREI GHT PREPAID MIDDLE ELEMENT
|
HS 780191
|
2022-06-15
|
2
UNT
|
18840KG
|
BEAM ACCESSORIES PROJECT SITE C CLEAN ENER GY PROJECT ATB JOB 30104 CP 06 SPSL LIFTING BEAM NET WEIGHT KG ... 18597 GROSS WEIGHT KG ... 18840 DIMENSIONS MM ... FREIGHT PREPAID BEAM
|
HS 845699
|
2022-05-28
|
2
UNT
|
11300KG
|
LIFTING BEAM BEAM ACCESSORIE PROJECT SITE C CLEAN ENERG Y PROJECT ATB JOB 30104 CP 04 LLMG LIFTING BEAM NET WEIGHT KG .... 11240 GROSS WEIGHT KG .... 11300 DIMENSIONS MM .... FREIGHT PREPAID
|
HS 845699
|
2022-03-14
|
3
UNT
|
94260KG
|
IRON GATE A IRON GATE B IRON GATE C PROJECT SITE C CLEAN ENERGY PR OJECT ATB JOB 30104 CP03 LLOG GATE ELEMENTS GATE 4 5 6 IN TRANSIT FINAL DESTINATION CA NADA FOR SHIPPERS REFERENCE ONLY WITHOUT LI ABILITY TO THE CARRIER FREIGHT PREPAID
|
HS 848180
|
2022-01-31
|
9
UNT
|
205500KG
|
PROJECT SITE C CLEAN ENERGY PROJECT ATB J OB 30104 CP03 LLOG GATE ELEMENTS GATE 4 5 6 NET WEIGHT KG 205500 GROSS WEIGHT K G 205500 DIMENSIONS MM FREIGHT PREPAID PROJECT SITE C CLEAN ENERGY PROJECT ATB J OB 30104 CP03 LLOG GATE ELEMENTS GATE 4 5 6 NET WEIGHT KG 205500 GROSS WEIGHT K G 205500 DIMENSIONS MM FREIGHT PREPAID PROJECT SITE C CLEAN ENERGY PROJECT ATB J OB 30104 CP03 LLOG GATE ELEMENTS GATE 4 5 6 NET WEIGHT KG 205500 GROSS WEIGHT K G 205500 DIMENSIONS MM FREIGHT PREPAID PROJECT SITE C CLEAN ENERGY PROJECT ATB J OB 30104 CP03 LLOG GATE ELEMENTS GATE 4 5 6 NET WEIGHT KG 205500 GROSS WEIGHT K G 205500 DIMENSIONS MM FREIGHT PREPAID PROJECT SITE C CLEAN ENERGY PROJECT ATB J OB 30104 CP03 LLOG GATE ELEMENTS GATE 4 5 6 NET WEIGHT KG 205500 GROSS WEIGHT K G 205500 DIMENSIONS MM FREIGHT PREPAID PROJECT SITE C CLEAN ENERGY PROJECT ATB J OB 30104 CP03 LLOG GATE ELEMENTS GATE 4 5 6 NET WEIGHT KG 205500 GROSS WEIGHT K G 205500 DIMENSIONS MM FREIGHT PREPAID PROJECT SITE C CLEAN ENERGY PROJECT ATB J OB 30104 CP03 LLOG GATE ELEMENTS GATE 4 5 6 NET WEIGHT KG 205500 GROSS WEIGHT K G 205500 DIMENSIONS MM FREIGHT PREPAID PROJECT SITE C CLEAN ENERGY PROJECT ATB J OB 30104 CP03 LLOG GATE ELEMENTS GATE 4 5 6 NET WEIGHT KG 205500 GROSS WEIGHT K G 205500 DIMENSIONS MM FREIGHT PREPAID PROJECT SITE C CLEAN ENERGY PROJECT ATB J OB 30104 CP03 LLOG GATE ELEMENTS GATE 4 5 6 NET WEIGHT KG 205500 GROSS WEIGHT K G 205500 DIMENSIONS MM FREIGHT PREPAID
|
HS 310510
|
2022-01-31
|
9
UNT
|
205500KG
|
PROJECT SITE C CLEAN ENERGY PROJECT ATB J OB 30104 CP03 LLOG GATE ELEMENTS GATE 4 5 6 NET WEIGHT KG 205500 GROSS WEIGHT K G 205500 DIMENSIONS MM FREIGHT PREPAID PROJECT SITE C CLEAN ENERGY PROJECT ATB J OB 30104 CP03 LLOG GATE ELEMENTS GATE 4 5 6 NET WEIGHT KG 205500 GROSS WEIGHT K G 205500 DIMENSIONS MM FREIGHT PREPAID PROJECT SITE C CLEAN ENERGY PROJECT ATB J OB 30104 CP03 LLOG GATE ELEMENTS GATE 4 5 6 NET WEIGHT KG 205500 GROSS WEIGHT K G 205500 DIMENSIONS MM FREIGHT PREPAID PROJECT SITE C CLEAN ENERGY PROJECT ATB J OB 30104 CP03 LLOG GATE ELEMENTS GATE 4 5 6 NET WEIGHT KG 205500 GROSS WEIGHT K G 205500 DIMENSIONS MM FREIGHT PREPAID PROJECT SITE C CLEAN ENERGY PROJECT ATB J OB 30104 CP03 LLOG GATE ELEMENTS GATE 4 5 6 NET WEIGHT KG 205500 GROSS WEIGHT K G 205500 DIMENSIONS MM FREIGHT PREPAID PROJECT SITE C CLEAN ENERGY PROJECT ATB J OB 30104 CP03 LLOG GATE ELEMENTS GATE 4 5 6 NET WEIGHT KG 205500 GROSS WEIGHT K G 205500 DIMENSIONS MM FREIGHT PREPAID PROJECT SITE C CLEAN ENERGY PROJECT ATB J OB 30104 CP03 LLOG GATE ELEMENTS GATE 4 5 6 NET WEIGHT KG 205500 GROSS WEIGHT K G 205500 DIMENSIONS MM FREIGHT PREPAID PROJECT SITE C CLEAN ENERGY PROJECT ATB J OB 30104 CP03 LLOG GATE ELEMENTS GATE 4 5 6 NET WEIGHT KG 205500 GROSS WEIGHT K G 205500 DIMENSIONS MM FREIGHT PREPAID PROJECT SITE C CLEAN ENERGY PROJECT ATB J OB 30104 CP03 LLOG GATE ELEMENTS GATE 4 5 6 NET WEIGHT KG 205500 GROSS WEIGHT K G 205500 DIMENSIONS MM FREIGHT PREPAID
|
HS 310510
|
2022-01-31
|
4
UNT
|
85500KG
|
PROJECT SITE C CLEAN ENERGY PROJECT ATB J OB 30104 CP04 LLMG GATE FREIGHT PREPAID PROJECT SITE C CLEAN ENERGY PROJECT ATB J OB 30104 CP04 LLMG GATE FREIGHT PREPAID PROJECT SITE C CLEAN ENERGY PROJECT ATB J OB 30104 CP04 LLMG GATE FREIGHT PREPAID PROJECT SITE C CLEAN ENERGY PROJECT ATB J OB 30104 CP04 LLMG GATE FREIGHT PREPAID
|
HS 271600
|
2022-01-31
|
4
UNT
|
85500KG
|
PROJECT SITE C CLEAN ENERGY PROJECT ATB J OB 30104 CP04 LLMG GATE FREIGHT PREPAID PROJECT SITE C CLEAN ENERGY PROJECT ATB J OB 30104 CP04 LLMG GATE FREIGHT PREPAID PROJECT SITE C CLEAN ENERGY PROJECT ATB J OB 30104 CP04 LLMG GATE FREIGHT PREPAID PROJECT SITE C CLEAN ENERGY PROJECT ATB J OB 30104 CP04 LLMG GATE FREIGHT PREPAID
|
HS 271600
|
2021-08-10
|
21
PCS
|
85440KG
|
PROJECT - SITE ON 5 PIECES + NR. 1 PALLET PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP05 - EMBEDDED PART SPOG (BAY 1-2-3) + BLOCKING MECHANISMPROJECT - SITE ON 3 PIECES PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP05 - EMBEDDED PART SPOG (BAY 1-2-3) + BLOCKING MECHANISMPROJECT - SITE ON 5 PIECES + NR. 1 PALLET PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP05 - EMBEDDED PART SPOG (BAY 1-2-3) + BLOCKING MECHANISM . . . . .PROJECT - SITE ON 5 PIECES + NR. 1 PALLET PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP05 - EMBEDDED PART SPOG (BAY 1-2-3) + BLOCKING MECHANISM
|
HS 293292
|
2021-08-10
|
4
PCS
|
98440KG
|
PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP03- LLOG GATE ELEMENTS (GATE 3)PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP03- LLOG GATE ELEMENTS (GATE 3)CLEAN ENERGY PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP03- LLOG GATE ELEMENTS (GATE 3)PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP03- LLOG GATE ELEMENTS (GATE 3)
|
HS 271600
|
2021-07-10
|
4
PCS
|
98440KG
|
GATE ELEMENTS PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP03- LLOG GATE ELEMENTS (GATE 1) SHIPPED FROM ITALY TO CANADA . .GATE ELEMENTS PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP03- LLOG GATE ELEMENTS (GATE 1) SHIPPED FROM ITALY TO CANADAGATE ELEMENTS PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP03- LLOG GATE ELEMENTS (GATE 1) SHIPPED FROM ITALY TO CANADAGATE ELEMENTS PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP03- LLOG GATE ELEMENTS (GATE 1) SHIPPED FROM ITALY TO CANADA
|
HS 848180
|
2021-06-26
|
42
PCS
|
70240KG
|
PROJECT ATB JOB 30104 PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP03- LLOG II PHASE (SET 5 + SET 6) TOTAL NET WEIGHT (KG) 24870 TOTAL GROSS WEIGHT (KG) 24890PROJECT ATB JOB 30104 PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP03- LLOG II PHASE (SET 5 + SET 6) TOTAL NET WEIGHT (KG) 20450 TOTAL GROSS WEIGHT (KG) 20470 XXMANAGER, BUSINESS DEVELOPMENT & OPERATIONS OFFICE 778-373-5465 CELL 604-653-6968 FAX. 403-514-6911 E-MAIL JULIANA.GIBBONSROLIPROJECTS.COM WEBSITE WWW.ROLIPROJECTS.COM SHIPPED FROM ITALY TO CANADAPROJECT ATB JOB 30104 PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP03- LLOG II PHASE (SET 5 + SET 6) TOTAL NET WEIGHT (KG) 24860 TOTAL GROSS WEIGHT (KG) 24880
|
HS 310510
|
2021-04-16
|
1
PCS
|
10000KG
|
PROJECT - SITE C CLEAN ENERGY PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP07 DTMG LIFTING BEAM SHIPPED FROM ITALY TO CANADA . .
|
HS 271600
|
2021-04-16
|
40
PKG
|
68390.63KG
|
PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB30104 CP-04-LLMG II PHASE (SET 1 + SET 2)PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB30104 CP-04-LLMG II PHASE (SET 1 + SET 2)PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB30104 CP-04-LLMG II PHASE (SET 1 + SET 2) SHIPPED FROM ITALY TO CANADA
|
HS 710410
|
2021-02-26
|
4
PCS
|
130840KG
|
PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 INTAKE OPERATING GATE ELEMENTS (INOG) SHIPPED FROM ITALY TO CANADAPROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 INTAKE OPERATING GATE ELEMENTS (INOG) SHIPPED FROM ITALY TO CANADAPROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 INTAKE OPERATING GATE ELEMENTS (INOG) SHIPPED FROM ITALY TO CANADA . . . .PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 INTAKE OPERATING GATE ELEMENTS (INOG) SHIPPED FROM ITALY TO CANADA
|
HS 271600
|
2021-02-26
|
4
PCS
|
130840KG
|
PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 INTAKE OPERATING GATE ELEMENTS (INOG) SHIPPED FROM ITALY TO CANADAPROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 INTAKE OPERATING GATE ELEMENTS (INOG) SHIPPED FROM ITALY TO CANADAPROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 INTAKE OPERATING GATE ELEMENTS (INOG) SHIPPED FROM ITALY TO CANADA . . . .PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 INTAKE OPERATING GATE ELEMENTS (INOG) SHIPPED FROM ITALY TO CANADA
|
HS 271600
|
2021-02-09
|
13
PCS
|
48400KG
|
ENERGY CP01-CROSSHEAD E GIMBAL PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 SHIPPED FROM ITALY TO CANADA . . .ENERGY CP01-CROSSHEAD E GIMBAL PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 SHIPPED FROM ITALY TO CANADA
|
HS 271600
|
2021-02-09
|
16
PKG
|
21345.06KG
|
NR. 12 PALLET + NR. 4 CARDBOARD BOXES + NR. 2WOODEN BOXES TOTAL NET WEIGHT (KG) : 1618 5 PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 SPECIAL WASHERS S690QL/S700MC+BOLTSFOR INOG GATE NR.4-5-6 + BOLTS FOR DTMG GAT E UNIT 1-2-3-4 SHIPPED FROM ITALY TO CANADA
|
HS 290490
|
2021-01-11
|
8
PCS
|
168960KG
|
PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP07-DTMG GATE - UNIT 1 / UNIT 2 / UNIT 5 / UNIT 6 SHIPPED FROM ITALY TO CANADA DTMG GATE STRUCTURE TOP ELEMENTPROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP07-DTMG GATE - UNIT 1 / UNIT 2 / UNIT 5 / UNIT 6 SHIPPED FROM ITALY TO CANADA DTMG GATE STRUCTURE BOTTOM ELEMENTPROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP07-DTMG GATE - UNIT 1 / UNIT 2 / UNIT 5 / UNIT 6 SHIPPED FROM ITALY TO CANADA DTMG GATE STRUCTURE TOP ELEMENTPROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP07-DTMG GATE - UNIT 1 / UNIT 2 / UNIT 5 / UNIT 6 SHIPPED FROM ITALY TO CANADA DTMG GATE STRUCTURE TOP ELEMENTPROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP07-DTMG GATE - UNIT 1 / UNIT 2 / UNIT 5 / UNIT 6 SHIPPED FROM ITALY TO CANADA DTMG GATE STRUCTURE TOP ELEMENTPROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP07-DTMG GATE - UNIT 1 / UNIT 2 / UNIT 5 / UNIT 6 SHIPPED FROM ITALY TO CANADA DTMG GATE STRUCTURE BOTTOM ELEMENTPROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP07-DTMG GATE - UNIT 1 / UNIT 2 / UNIT 5 / UNIT 6 SHIPPED FROM ITALY TO CANADA DTMG GATE STRUCTURE BOTTOM ELEMENTPROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP07-DTMG GATE - UNIT 1 / UNIT 2 / UNIT 5 / UNIT 6 SHIPPED FROM ITALY TO CANADA DTMG GATE STRUCTURE BOTTOM ELEMENT . . .
|
HS 293339
|
2021-01-11
|
4
PCS
|
130840KG
|
GATE ELEMENTS PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 INTAKE OPERATING GATE ELEMENTS (INOG) SHIPPED FROM ITALY TO CANADAGATE ELEMENTS PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 INTAKE OPERATING GATE ELEMENTS (INOG) SHIPPED FROM ITALY TO CANADA . . . .GATE ELEMENTS PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 INTAKE OPERATING GATE ELEMENTS (INOG) SHIPPED FROM ITALY TO CANADAGATE ELEMENTS PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 INTAKE OPERATING GATE ELEMENTS (INOG) SHIPPED FROM ITALY TO CANADA
|
HS 730110
|
2020-12-26
|
4
PCS
|
84120KG
|
CLEAN ENERGY PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP07-DTMG GATE - UNIT 3 + UNIT 4 SHIPPED FROM ITALY TO CANADACLEAN ENERGY PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP07-DTMG GATE - UNIT 3 + UNIT 4CLEAN ENERGY PROJECT -
|
HS 271600
|
2020-12-08
|
4
PCS
|
84380KG
|
PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP07-DTMG GATE - UNIT 7 + UNIT 8 SHIPPED FROM ITALY TO CANADAPROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP07-DTMG GATE - UNIT 7 + UNIT 8 SHIPPED FROM ITALY TO CANADAPROJECT - SITE C CL
|
HS 271600
|
2020-11-30
|
4
PCS
|
130840KG
|
INTAKE OPERATING GATE ELEMENTS (INOG) PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 SHIPPED FROM ITALY TO CANADA . . . . .INTAKE OPERATING GATE ELEMENTS (INOG) PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 SHIPPED FROM ITALY TO CANADA
|
HS 271600
|
2020-11-30
|
33
PKG
|
63840.57KG
|
PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB30104 CP02 - INMG II STAGE E/P 4 - 5 - 6 SET SHIPPED FROM ITALY TO CANADAPROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB30104 CP02 - INMG II STAGE E/P 4 - 5 - 6 SET SHIPPED FROM ITALY TO CANADAPROJECT -
|
HS 290719
|
2020-11-23
|
4
PCS
|
130840KG
|
INTAKE OPERATING GATE ELEMENTS (INOG) PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 SHIPPED FROM ITALY TO CANADAINTAKE OPERATING GATE ELEMENTS (INOG) PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 SHIPPED FROM ITALY TO CANADAINTAKE OP
|
HS 271600
|
2020-11-08
|
13
PCS
|
6885KG
|
ENERGY PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 BOLTS + ACCESSORIES FOR 1 - 2 - 3 INOG GATE
|
HS 271600
|
2020-11-08
|
33
PCS
|
50907KG
|
PROJECT PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP02 - INMG II STAGE E/P 1 - 2 - 3 SET . . . . . .PROJECT PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 CP02 - INMG II STAGE E/P 1 - 2 - 3 SET . . . . . .PROJECT PROJECT - SITE C
|
HS 291890
|
2020-10-09
|
4
PCS
|
130840KG
|
CONSTRUCTION MATERIAL INTAKE OPERATING GATE ELEMENTS (INOG)GATE INTAKE OPERATING GATE ELEMENTS (INOG)CONSTRUCTION MATERIAL INTAKE OPERATING GATE ELEMENTS (INOG)CONSTRUCTION MATERIAL INTAKE OPERATING GATE ELEMENTS (INOG) PROJECT - SITE C CLE
|
HS 350699
|
2020-10-02
|
4
PCS
|
130840KG
|
PROJECT INTAKE OPERATING GATE ELEMENTS (INOG)GATE PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 INTAKE OPERATING GATE ELEMENTS (INOG) SHIPPING MARKS ATB RIVA CALZONI HYDRO CANADA INC. 1200 - 1075 WEST GEORGIA STREET VANCOUVER BC V6E 3C9 - CANAD
|
HS 842131
|
2020-08-28
|
45
PKG
|
130730.7KG
|
PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB30104 INTAKE OPERATING GATE (INOG) - SECOND STAGE EMBEDDED PARTS SHIPPED FROM ITALY TO CANADAPROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB30104 INTAKE OPERATING GATE (INOG) - SECOND STAGE EMBEDDED PARTS SH
|
HS 271600
|
2020-07-31
|
19
PCS
|
50356.4KG
|
NR. 8 PIECES (FRAME 3) + NR. 4 PALLET (DOGGING BEAM) INTAKE OPERATING GATE (INOG) - SECONDSTAGE EMBEDDED PARTS + DOGGING BEAM INMGNR. 6 PIECES (BACK GUIDE SET 3) + NR. 1 PALL ET INTAKE OPERATING GATE (INOG) - SECOND STA GE EMBEDDED PARTS + DOGGING BE
|
HS 292130
|
2020-07-24
|
30
PKG
|
84568.73KG
|
NR. 16 PIECES (FRAME 1-2) INTAKE OPERATING GATE (INOG) - SECOND STAGE EMBEDDED PARTS SHIP PED FROM ITALY TO CANADANR. 6 PIECES (BACK GUIDE SET 2) + NR. 1 PALLET INTAKE OPERATING GATE (INOG) - SECOND STAGEEMBEDDED PARTSNR. 6 PIECES (BACK GUIDE SE
|
HS 291439
|
2020-02-21
|
24
PKG
|
45940.15KG
|
NR. 8 PIECES + NR. 2 BUNDLES + NR. 2 PALLET PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB30104 DRAFT TUBE MAINTENANCE GATE (DTMG) - EMBEDDED PARTS, SECOND STAGENR. 8 PIECES + NR. 2 BUNDLES + NR. 2 PALLET PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB3
|
HS 292145
|
2020-01-24
|
24
PCS
|
46010.46KG
|
DRAFT TUBE MAINTENANCE GATE (DTMG) - EMBEDDEDPARTS, SECOND STAGEDRAFT TUBE MAINTENANCE GATE (DTMG) - EMBEDDEDPARTS, SECOND STAGE SHIPPED FROM ITALY TO CANADA
|
HS 340520
|
2020-01-17
|
24
PKG
|
45940.15KG
|
NR. 8 PIECES + NR. 2 BUNDLES + NR. 2 PALLET DRAFT TUBE MAINTENANCE GATE (DTMG) - EMBEDDEDPARTS, SECOND STAGE SHIPPED FROM ITALY TO C ANADANR. 8 PIECES + NR. 2 BUNDLES + NR. 2 PALLET DRAFT TUBE MAINTENANCE GATE (DTMG) - EMBEDDEDPARTS, SECOND STAGE
|
HS 292145
|
2019-12-20
|
49
PKG
|
94100.68KG
|
PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB30104 DRAFT TUBE MAINTENANCE GATE (DTMG) - E MBEDDED PARTS, SECOND STAGE GATE DRAFT HS CODE: 730890PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB30104 DRAFT TUBE MAINTENANCE GATE (DTMG) - E MBEDDED PARTS, S
|
HS 730890
|
2019-10-25
|
18
PCS
|
38480KG
|
PROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 GATE - DRAFT TUBE MAINTENANCE (DTMG) - EMBEDDED PARTS, SECOND STAGEPROJECT - SITE C CLEAN ENERGY PROJECT ATB JOB 30104 GATE - DRAFT TUBE MAINTENANCE (DTMG) - EMBEDDED PARTS, SECOND STAGE
|
HS 852812
|